Project | Date | Client |
Liceo de Chacarita | 2023-2024 | Chacarita High School Administrative Board – Educational Infrastructure Directorate (DIE) |
Liceo Rural China Kichá Talamanca | 2023 | China Kichá Rural High School Administrative Board – Educational Infrastructure Directorate (DIE) |
Liceo Santísima Trinidad | 2023 | Liceo Santisima Trinidad Administrative Board – Educational Infrastructure Directorate (DIE) |
Parque logístico Ruta 1, Mezanine oficinas | 2023 | PIASA |
Parque logístico Ruta 1, Mezanine Picking | 2023 | PIASA |
Parque logístico Ruta 1 | 2023 | PIASA |
Electromechanical and Civil Work in expansion of the COSAC Production plant | 2023 | Corrugado del Atlántico |
S.T. Santa Rosa | 2023 | Coopelesca |
Pacific Railway Station Workshops | 2022 | Instituto Costarricense de Ferrocarriles INCOFER |
Construction of Main Warehouse | 2022 | Ingenio Taboga |
ALFICAR Lighting and electrical connections system | 2022 | Portland Mills. |
JASEC pressure pipe repair | 2022 | JASEC |
Construction and Rehabilitation of Hydraulic Works of the Palmar Sur Irrigation Infrastructure | 2022 | Corporación Bananera Nacional (CORBANA) |
Route 27 Weighing Station | 2022 | Fideicomiso de Administración de Obras Conexas Carretera San Jose-Caldera – CNC-MOPT/BNCR 2015 |
S.T. Muelle | 2021 | Coopelesca |
Remodeling of Electromechanical Systems in Dental Clinic | 2021 | Clínica Dental del Norte |
Plant Agricultural products from the field | 2021 | Área 2600 m² |
Weighing Station Route 1 | 2021 | Consejo Nacional de Vialidad (CONAVI) |
S.T. Belén | 2021 | CFS Sistemas |
Rehabilitation of infrastructure and Agricultural Production Talamanca | 2021 | Comisión Nacional de Emergencias (CNE) |
P.S. Valle Escondido | 2021 | Natural Partners S.A |
S.T. Pinilla | 2021 | Coopeguanacaste |
Construction of Cell No. 2 Guanacaste Sanitary Landfill | 2021 | Municipalidad de Santa Cruz |
S.T. Higuito (Montaje Electromecánico) | 2020 | General Electric |
S.T. Tejar (Electromechanical Assembly) | 2020 | General Electric |
Bartolo Recope Dam and Protection Works | 2020 | MECO |
Polioduct Protection | 2020 | Refinadora Costarricense de Petróleo |
Edificio Coopeande N°1, San José Remodelación Electromecánica de Edificio Coopeande | 2019 | Coopeande N°1 |
Puente vehicular sobre Rio Buenaventura ruta nacional N°34 | 2019 | MECO |
Cuajiniquil High School | 2019 | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Valle Verde Rural High School | 2019 | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Nuevo Amanecer School | 2019 | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
San Antonio del Humo High School | 2019 | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Barra Parisimina TV High School | 2019 | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
San José Rural High School | 2019 | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
P.E. Cacao | 2018 | Coopeguanacaste |
S.T. Mogote (modulo ESPH) | 2018 | Para el P.H. Los Negros II |
Delegación Policial de Parrita | 2018 | Ministerio de Seguridad Publica |
P.E. Rio Naranjo | 2017 | Coopeguanacaste |
C.H. Torito | 2016 | Union Fenosa Generadora Torito |
S.T. Miravalles (Modulo Bijagua) | 2016 | Coopeguanacaste |
S.T. Mogote (modulo Mogote) | 2016 | Fila de Mogote DCR, S.R.L |
P.E Mogote | 2016 | Hunt Energy |
P.E Vientos de la Perla | 2016 | Iberdrola Ingeniería y Construcción |
P.E Vientos de Miramar | 2016 | Iberdrola Ingeniería y Construcción |
P.E Altamira | 2016 | Iberdrola Ingeniería y Construcción |
P.E Campos Azules | 2016 | Iberdrola Ingeniería y Construcción |
San Cruz Police Station | 2016 | Ministry of Public Security |
Sarapiquí Police Station | 2016 | Ministry of Public Security |
C.H Bijagua | 2015 | Coopeguanacaste R.L |
S.T El Tanque | 2015 | Tilawind Corporation (Costa Rica) |
P.E. Tilawind | 2015 | Tilawind Corporation (Costa Rica/España) |
P.E Vientos del Este | 2015 | Aeroenergía |
Community Hall Dulce Nombre de Cedral | 2015 | Community Association of Dulce Nombre |
S.T. Reventazón | 2014-2015 | Inabensa / Abengoa (España) |
P.E. Orosí | 2014 | Gamesa Eólica (España) |
P.H. Chimurria | 2014 | Hidro Chimurria S.A. (Costa Rica) |
C.H. Torito | 2013 | Obras Subterráneas S.A. (OSSA) (España) |
S.T. Tejona | 2013 | Acciona Energia de Costa Rica S.A (España) |
S.T. Chiripa | 2013 | Asturwatt / Tensa (España) |
P.E. Chiripa | 2013 | Acciona Energia de Costa Rica S.A (España) |
P.H. Torito | 2012-2013 | Obras Subterráneas S.A. (OSSA) (España) |
C.H Cubujuquí | 2012 | Coopelesca R.L. (Costa Rica) |
P.E. Los Santos | 2011 | Coopesantos R.L. (Costa Rica) |
P.H Cubujuquí | 2011 | Coopelesca R.L. (Costa Rica) |
C.H. Santa Rufina | 2010-2013 | Peters S.A. |
P.H. San Lorenzo | 2010-2013 | Coneléctricas R.L. (Costa Rica) |
C.H. Pocosol & Agua Gata | 2009 | Coneléctricas R.L. (Costa Rica) |
S.T. Papagayo | 2008-2009 | Alusa Engenharia Ltda. (Brasil) |
S.T. Nuevo Colón | 2008-2009 | Alusa Engenharia Ltda. (Brasil) |
S.T. Liberia | 2008-2009 | Alusa Engenharia Ltda. (Brasil) |
P.H. San Joaquín – Los Santos | 2009 | Coopesantos R.L (Costa Rica) |
P.H. Pocosol & Agua Gata | 2009-2010 | Coneléctricas R.L. (Costa Rica) |
P.H. Choco Florencia | 2008 | Coopelesca R.L. (Costa Rica) |
C.H. Canalete | 2005-2007 | Coopeguanacaste R.L (Costa Rica) |
Chocosuelas Hydroelectric Power Plant Complex | 1999-2003 | Coopelesca R.L. (Costa Rica) |
C.H. Caño Grande III | 1998 | Hidro Venecia S.A. (Costa Rica) |
CEMCO building | 1997 | Episcopal Conference |
Gabion wall | 1997 | Cadena Comercial Sancarleña S.A |
C.H. El Embalse | 1997 | El Embalse S.A. (Costa Rica) |
Apartaments | 1996 | CITRORICO S.A. |
Truck hangar | 1996 | CITRORICO S.A. |
Housing project Doña Dora | 1996 | Banco Popular y de Desarrollo Comunal |
Housing project Santa Rosa | 1996 | COOCIQUE R.L. |
Telephone exchange Boca Arenal | 1995 | I.C.E. |
Telephone exchange Fraijanes | 1995 | I.C.E. |
Telephone exchange Pandora-Limón | 1995 | I.C.E. |
Hospital Clinic Monte Sinaí | 1995 | Monte Sinaí Hospital Clinic |
Hangar for tractors | 1995 | CITRORICO S.A. |
Truck hangar | 1995 | CITRORICO S.A. |
Holiday Resort Villa Huetares, Guanacaste | 1994 | Complejo Turístico Villa Huetares S.A. |
C.H. Caño Grande I y II | 1993 | Hidroeléctrica Caño Grande S.A. (Costa Rica) |
C.H. Hidro Zarcas | 1993 | Hidro Zarcas S.A. |
C.H. Hospital | 1991 | Empresa Hidroeléctrica Matamoros S.A. |
Banco Popular y de Desarrollo Comunal | 1989 | Banco Popular y de Desarrollo Comunal |
Project | Liceo de Chacarita |
Date | 2023-2024 |
Client | Chacarita High School Administrative Board – Educational Infrastructure Directorate (DIE) |
Project | Liceo Rural China Kichá Talamanca |
Date | 2023 |
Client | China Kichá Rural High School Administrative Board – Educational Infrastructure Directorate (DIE) |
Project | Liceo Santísima Trinidad |
Date | 2023 |
Client | Liceo Santisima Trinidad Administrative Board – Educational Infrastructure Directorate (DIE) |
Project | Parque logístico Ruta 1, Mezanine oficinas |
Date | 2023 |
Client | PIASA |
Project | Parque logístico Ruta 1, Mezanine Picking |
Date | 2023 |
Client | PIASA |
Project | Parque logístico Ruta 1 |
Date | 2023 |
Client | PIASA |
Project | Electromechanical and Civil Work in expansion of the COSAC Production plant |
Date | 2023 |
Client | Corrugado del Atlántico |
Project | S.T. Santa Rosa |
Date | 2023 |
Client | Coopelesca |
Project | Pacific Railway Station Workshops |
Date | 2022 |
Client | Instituto Costarricense de Ferrocarriles INCOFER |
Project | Construction of Main Warehouse |
Date | 2022 |
Client | Ingenio Taboga |
Project | ALFICAR Lighting and electrical connections system |
Date | 2022 |
Client | Portland Mills. |
Project | JASEC pressure pipe repair |
Date | 2022 |
Client | JASEC |
Project | Construction and Rehabilitation of Hydraulic Works of the Palmar Sur Irrigation Infrastructure |
Date | 2022 |
Client | Corporación Bananera Nacional (CORBANA) |
Project | Route 27 Weighing Station |
Date | 2022 |
Client | Fideicomiso de Administración de Obras Conexas Carretera San Jose-Caldera – CNC-MOPT/BNCR 2015 |
Project | S.T. Muelle |
Date | 2021 |
Client | Coopelesca |
Project | Remodeling of Electromechanical Systems in Dental Clinic |
Date | 2021 |
Client | Clínica Dental del Norte |
Project | Plant Agricultural products from the field |
Date | 2021 |
Client | Área 2600 m² |
Project | Weighing Station Route 1 |
Date | 2021 |
Client | Consejo Nacional de Vialidad (CONAVI) |
Project | S.T. Belén |
Date | 2021 |
Client | CFS Sistemas |
Project | Rehabilitation of infrastructure and Agricultural Production Talamanca |
Date | 2021 |
Client | Comisión Nacional de Emergencias (CNE) |
Project | P.S. Valle Escondido |
Date | 2021 |
Client | Natural Partners S.A |
Project | S.T. Pinilla |
Date | 2021 |
Client | Coopeguanacaste |
Project | Construction of Cell No. 2 Guanacaste Sanitary Landfill |
Date | 2021 |
Client | Municipalidad de Santa Cruz |
Project | S.T. Higuito (Montaje Electromecánico) |
Date | 2020 |
Client | General Electric |
Project | S.T. Tejar (Electromechanical Assembly) |
Date | 2020 |
Client | General Electric |
Project | Bartolo Recope Dam and Protection Works |
Date | 2020 |
Client | MECO |
Project | Polioduct Protection |
Date | 2020 |
Client | Refinadora Costarricense de Petróleo |
Project | Edificio Coopeande N°1, San José Remodelación Electromecánica de Edificio Coopeande |
Date | 2019 |
Client | Coopeande N°1 |
Project | Puente vehicular sobre Rio Buenaventura ruta nacional N°34 |
Date | 2019 |
Client | MECO |
Project | Cuajiniquil High School |
Date | 2019 |
Client | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Project | Valle Verde Rural High School |
Date | 2019 |
Client | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Project | Nuevo Amanecer School |
Date | 2019 |
Client | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Project | San Antonio del Humo High School |
Date | 2019 |
Client | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Project | Barra Parisimina TV High School |
Date | 2019 |
Client | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Project | San José Rural High School |
Date | 2019 |
Client | MEP submitted to the Trust Law 9124 Banco Nacional Trustee |
Project | P.E. Cacao |
Date | 2018 |
Client | Coopeguanacaste |
Project | S.T. Mogote (modulo ESPH) |
Date | 2018 |
Client | Para el P.H. Los Negros II |
Project | Delegación Policial de Parrita |
Date | 2018 |
Client | Ministerio de Seguridad Publica |
Project | P.E. Rio Naranjo |
Date | 2017 |
Client | Coopeguanacaste |
Project | C.H. Torito |
Date | 2016 |
Client | Union Fenosa Generadora Torito |
Project | S.T. Miravalles (Modulo Bijagua) |
Date | 2016 |
Client | Coopeguanacaste |
Project | S.T. Mogote (modulo Mogote) |
Date | 2016 |
Client | Fila de Mogote DCR, S.R.L |
Project | P.E Mogote |
Date | 2016 |
Client | Hunt Energy |
Project | P.E Vientos de la Perla |
Date | 2016 |
Client | Iberdrola Ingeniería y Construcción |
Project | P.E Vientos de Miramar |
Date | 2016 |
Client | Iberdrola Ingeniería y Construcción |
Project | P.E Altamira |
Date | 2016 |
Client | Iberdrola Ingeniería y Construcción |
Project | P.E Campos Azules |
Date | 2016 |
Client | Iberdrola Ingeniería y Construcción |
Project | San Cruz Police Station |
Date | 2016 |
Client | Ministry of Public Security |
Project | Sarapiquí Police Station |
Date | 2016 |
Client | Ministry of Public Security |
Project | C.H Bijagua |
Date | 2015 |
Client | Coopeguanacaste R.L |
Project | S.T El Tanque |
Date | 2015 |
Client | Tilawind Corporation (Costa Rica) |
Project | P.E. Tilawind |
Date | 2015 |
Client | Tilawind Corporation (Costa Rica/España) |
Project | P.E Vientos del Este |
Date | 2015 |
Client | Aeroenergía |
Project | Community Hall Dulce Nombre de Cedral |
Date | 2015 |
Client | Community Association of Dulce Nombre |
Project | S.T. Reventazón |
Date | 2014-2015 |
Client | Inabensa / Abengoa (España) |
Project | P.E. Orosí |
Date | 2014 |
Client | Gamesa Eólica (España) |
Project | P.H. Chimurria |
Date | 2014 |
Client | Hidro Chimurria S.A. (Costa Rica) |
Project | C.H. Torito |
Date | 2013 |
Client | Obras Subterráneas S.A. (OSSA) (España) |
Project | S.T. Tejona |
Date | 2013 |
Client | Acciona Energia de Costa Rica S.A (España) |
Project | S.T. Chiripa |
Date | 2013 |
Client | Asturwatt / Tensa (España) |
Project | P.E. Chiripa |
Date | 2013 |
Client | Acciona Energia de Costa Rica S.A (España) |
Project | P.H. Torito |
Date | 2012-2013 |
Client | Obras Subterráneas S.A. (OSSA) (España) |
Project | C.H Cubujuquí |
Date | 2012 |
Client | Coopelesca R.L. (Costa Rica) |
Project | P.E. Los Santos |
Date | 2011 |
Client | Coopesantos R.L. (Costa Rica) |
Project | P.H Cubujuquí |
Date | 2011 |
Client | Coopelesca R.L. (Costa Rica) |
Project | C.H. Santa Rufina |
Date | 2010-2013 |
Client | Peters S.A. |
Project | P.H. San Lorenzo |
Date | 2010-2013 |
Client | Coneléctricas R.L. (Costa Rica) |
Project | C.H. Pocosol & Agua Gata |
Date | 2009 |
Client | Coneléctricas R.L. (Costa Rica) |
Project | S.T. Papagayo |
Date | 2008-2009 |
Client | Alusa Engenharia Ltda. (Brasil) |
Project | S.T. Nuevo Colón |
Date | 2008-2009 |
Client | Alusa Engenharia Ltda. (Brasil) |
Project | S.T. Liberia |
Date | 2008-2009 |
Client | Alusa Engenharia Ltda. (Brasil) |
Project | P.H. San Joaquín – Los Santos |
Date | 2009 |
Client | Coopesantos R.L (Costa Rica) |
Project | P.H. Pocosol & Agua Gata |
Date | 2009-2010 |
Client | Coneléctricas R.L. (Costa Rica) |
Project | P.H. Choco Florencia |
Date | 2008 |
Client | Coopelesca R.L. (Costa Rica) |
Project | C.H. Canalete |
Date | 2005-2007 |
Client | Coopeguanacaste R.L (Costa Rica) |
Project | Chocosuelas Hydroelectric Power Plant Complex |
Date | 1999-2003 |
Client | Coopelesca R.L. (Costa Rica) |
Project | C.H. Caño Grande III |
Date | 1998 |
Client | Hidro Venecia S.A. (Costa Rica) |
Project | CEMCO building |
Date | 1997 |
Client | Episcopal Conference |
Project | Gabion wall |
Date | 1997 |
Client | Cadena Comercial Sancarleña S.A |
Project | C.H. El Embalse |
Date | 1997 |
Client | El Embalse S.A. (Costa Rica) |
Project | Apartaments |
Date | 1996 |
Client | CITRORICO S.A. |
Project | Truck hangar |
Date | 1996 |
Client | CITRORICO S.A. |
Project | Housing project Doña Dora |
Date | 1996 |
Client | Banco Popular y de Desarrollo Comunal |
Project | Housing project Santa Rosa |
Date | 1996 |
Client | COOCIQUE R.L. |
Project | Telephone exchange Boca Arenal |
Date | 1995 |
Client | I.C.E. |
Project | Telephone exchange Fraijanes |
Date | 1995 |
Client | I.C.E. |
Project | Telephone exchange Pandora-Limón |
Date | 1995 |
Client | I.C.E. |
Project | Hospital Clinic Monte Sinaí |
Date | 1995 |
Client | Monte Sinaí Hospital Clinic |
Project | Hangar for tractors |
Date | 1995 |
Client | CITRORICO S.A. |
Project | Truck hangar |
Date | 1995 |
Client | CITRORICO S.A. |
Project | Holiday Resort Villa Huetares, Guanacaste |
Date | 1994 |
Client | Complejo Turístico Villa Huetares S.A. |
Project | C.H. Caño Grande I y II |
Date | 1993 |
Client | Hidroeléctrica Caño Grande S.A. (Costa Rica) |
Project | C.H. Hidro Zarcas |
Date | 1993 |
Client | Hidro Zarcas S.A. |
Project | C.H. Hospital |
Date | 1991 |
Client | Empresa Hidroeléctrica Matamoros S.A. |
Project | Banco Popular y de Desarrollo Comunal |
Date | 1989 |
Client | Banco Popular y de Desarrollo Comunal |